Quality Management

Quality is controlled before shipment and after installation.

Quality control is not a final check only. It runs through material confirmation, production inspection, packing, loading, site installation and final acceptance.

QC System
QC Workflow

Six checkpoints for project quality control.

Each checkpoint is designed to reduce the risk of wrong materials, production errors, shipping damage and installation issues.

01

QC Process

Define quality checkpoints, approval standards and inspection timing before production starts.

02

Inspection

Check dimensions, surfaces, finishes, hardware, assembly details and batch consistency.

03

Packing

Review export protection, product labels, packing list and site installation sequence.

04

Container Loading

Load containers according to project areas, priority sequence and delivery batches.

05

Installation Acceptance

Check final appearance, alignment, surface quality, hardware function and handover details.

06

Installation Site

Follow overseas site progress and installation conditions, including Vietnam project site coordination.

Before & After

Site progress and final delivery comparison.

Before-after comparison helps clients see how project coordination, material delivery and installation quality become visible results.

Before

Before Installation

Review site dimensions, delivery route, wall and floor conditions, installation sequence and pending risks.

After

After Installation

Check final alignment, surface quality, hardware function, visible details and acceptance records.